Lifting 15000 ton oil platform

Four 8-point synclift systems are networked to 32-points lifting system
Four pumps with slave plc-controls and 32 jacks are connected to master control unit (laptop).
Lifting platform from temporary supports and lower on a barge for transport
Master control unit
Multiple point lifting with 200 and 600 ton CLRG-series high tonnage cylinders
Customer: 
Brasfels
Location: 
Brasil

Removed oil platform from temporary supports and lowered onto a barge for transport to final destination.