Platform Recovery
Location:
The Netherlands A salvage contractor’s offshore platform installation was unstable and at risk. Enerpac presented the contractor with a fully engineered recovery solution to lift the platform to safety. Enerpac later supplied them with 16 strand jacks and 120 tons of fabricated structures, and soon the platform was lifted to its required elevation and secured.
Year:
2010





