The stage for U2’s 360 Tour is being constructed using Enerpac’s Synchronous Lift System.......
Synchronous skidding, horizontal stage lifting for roof positioning.......
Hydraulics facilitate repairs on 12000 ton movable roof of Milwaukee’s Miller Park stadium.......
14000 ton stadium roof unloaded by removing 78 temporary pillars. Unloading was done using Enerpac's synchronous lifting system.......
Hydraulics with 8 winches and 44 trolleys take care of opening and closing of the 1100 ton roof halves.......
Chinese architectonic masterpiece moved to its new base. Hydraulic system monitored movements and process.......
Hoisting, relocating and positioning of roof segments using SyncHoist hydraulic load positioning.......
Synchronous system monitors and adjusts foundation movement between Prado Museum and surrounding buildings.......
Threaded bar stage lifting system with hydraulic jacks.......
Vertical hydraulic formwork traveller. Synchronous climbing system for scaffolding.......
Hydraulic system for vertical formwork traveller with PLC-synchronization......
Enerpac designed the roof actuation system which includes mechanical opening and closing and plc-controlled hydraulic braking system.......
9-points hydraulic synchronous actuation system opens and closes roof.......
Vertical hydraulic climbing system for formwork-traveller during construction of the Crystal Bank of America Tower.......
Construction of amphitheatre. Enerpac synchronous lifting and de-propping.......
House moving with synchronous lifting and lowering to avoid damage during movement.......