The 2200 tonnes of steel movable roof construction of the Nantong Stadium.
Hydraulics with 8 winches and 44 trolleys take care of opening and closing of the 1100 ton roof halves.
Advanced Enerpac hydraulics takes care of the safe and controlled opening and closing of the Nantong Stadium's roof. In this photograph, it is depicted during the testing phase in the opened position. It takes 20 to 30 minutes to open the roof.
The Nantong Stadium with movable roof in opened position.
8 Hydraulic winches make it possible to slide open and slide close the roof across rails.
44 trolleys move across rails and take care of the support of the movable Nantong Stadium's roof.