Home

POWERFUL SOLUTIONS.  GLOBAL FORCE.

  • home
  • about us
  • products
  • integrated solutions
  • distributors
  • resources & literature
  • contact us
home :: IS Markets :: Infrastructure

Enerpac Hydraulic System Integration for Millau Viaduct

Lifting Millau's Temporary Support Towers

Enerpac controlled hydraulic movement: lifting, launching, nose recovery, stage lifting.

All temporary support towers of the Millau Viaduct are step-by-step stage-lifted up to heights between 87 and 163 metres.

read more
  • customer: Eiffage Group TP
  • location: Millau Viaduct, France
  • Hydraulic system with cylinder, pump and PLC-control unit to lift the intermediate temporary piers.

    nose recovery system at the frontend approaches the temporary tower and will compensate height deviation during deck launching.

    • English (metric units)
      • English (imperial units)
      • german
      • french
      • italian
      • russian
      • chinese
      • japanese
      • korean
    • related products
    • high tonnage cylinders

    • Sync-Lift

    • Stage-Lift

    • related projects
    • Launch closes gap of Millau bridge deck

    • Printer-friendly versionPrinter-friendly version
    • home
    • contact
    • privacy policy
    • careers

    © 2010 ENERPAC. All rights reserved