Home

POWERFUL SOLUTIONS.  GLOBAL FORCE.

  • home
  • about us
  • products
  • integrated solutions
  • distributors
  • resources & literature
  • contact us
home :: IS Markets :: Oil, gas and petrochemicals

Anchor lifting in Australia's largest oil & gas project

Anchors lined up for lifting by the Enerpac hydraulic system from the deck. The safety and control valving system involved.

Hydraulics lift 900 32-ton anchors in a string of 80 km subsea pipelines in Australia’s largest oil and gas project.

read more
  • customer: Technip and Subsea 7
  • location: Australia
  • Enerpac hydraulics in 120 ton fine control lifting system and safety shutdown.

    Enerpac hydraulic system was custom built to lift and position these 32 ton achors in a string of 80 km subsea pipelines.

    The travelling frames in each of the two feed beds involved rode on Enerpac ER-60 60-tonne load skates.

    The travelling frames lined up before the rollout of the string of anchors, weighing 28800 tons to ensure stability of the 42 inch trunkline.

    • English (metric units)
      • English (imperial units)
      • german
      • french
      • italian
      • russian
      • chinese
      • japanese
      • korean
    • related products
    • long stroke cylinders

    • air hydraulic pumps

    • VC, VE, VM-series 4-way valves
    • load skates

    • related projects
    • Lifting petrochemical storage vessels

    • Printer-friendly versionPrinter-friendly version
    • home
    • contact
    • privacy policy
    • careers

    © 2010 ENERPAC. All rights reserved