Custom Solutions

Hydro-Cracker

Hydro-Cracker

The Enerpac B-Set self-erecting gantry combined strand jacking with hydraulic gantry and skidding...
Spindle bar launching system with nine hydraulic jacks per bridge

Down hill bridge launching

Project Overview The Mgeni Viaduct is located in Durban, South Africa and bridges the Mgeni river to...
Beijing's birds nest

Enerpac helps the Beijing’s "Bird’s Nest" to stand on its own feet

September 17, 2006, after two years of construction, the main venue for the 2008 Beijing Olympic...
Heavy-duty electrically powered hydraulic pump unit

Perfectly synchronised balance

Instead of the usual two floating cranes, only a single one was available for placing the...
Connecting Denmark and Sweden

Positioning bridge-elements and supporting the traffic deck

From the coast of Denmark a 2.2 miles (3,5 km) immersed tunnel will carry the traffic to a 2.5 miles...
Hydraulic Climbing system to build-up the telescopic temporary piers

A great new work of French Structural Engineering and Spanish/American Hydraulic Technology

In June 2002 Enerpac (Hydraulic Technology) was awarded the contract to supply the hydraulic system...
From Pier 7 to Pier 1

Pushing the 4000 ton deck out into space

The deck of what is going to be the world’s highest bridge is being launched over the Tarn valley,...
A hydraulic bottom chord replacement in progress

Hydraulics Boost Productivity

Early in the development of the Chicago expressway system, planners identified a link to the south...
The IRR industrial ring road project in Bangkok’s main industrial area with 13 km road connected by two 172 meters high bridges

Movement of the world’s largest movable scaffolding system

An industrial ring road is constructed to relieve the traffic congestion in Bangkok’s main...
The retracted Miller Park roof – three roof panels are

Repair 12000 ton moveable stadium roof

The day after the Milwaukee Brewers finished their final game of the season at Miller Park in...
The 2200 tonnes of steel movable roof construction of the Nantong Stadium

The stadium roof in the Chinese Nantong opens and closes by means of hydraulics

The new Nantong stadium in the Chinese Jiangsu province is China’s first large stadium with a roof...
SyncHoist – High precision load positioning

SyncHoist: High Accuracy Hoisting & Positioning

Since the advent of hydraulic jacks or lifting cylinders, construction engineers have had the...
Each bridge consists of two viaducts. Eight decks are launched with the Enerpac flexible spindle bar system

Flexible hydraulic system launches four different bridges

Engineers construct the new ring road around Teruel in Spain and developed with specialist Enerpac a...
Threaded bar stage lifting system for lifting and lowering

Stage lifting 300 years windmill

Lifting an entire mill from 1699 with all its fittings by two metres is quite something.FUNDERINGS-...
The Job is done. 23 metres higher then the Eiffel Tower.

Final Hydraulic Launch Successfully Closes last Gap in the Millau Viaduct in the South of France

Millau, FranceFriday May 28th, 2004  the Millau Viaduct in the South of France reached a great...