Offloading a 1,300 ton Hydrocracker

Two SBL1100 gantry systems offload a 1,306 ton hydrocracker
Customer: 
Beluga Projects Logistic, CJSC
Location: 
Russia


Challenge: Beluga was tasked with offloading a hydrocracker weighing 1,306 tons from a barge and bringing it onshore. Due to the weight and length of the hydrocracker utilizing a crane was not an option.

Solution: Beluga utilized two SBL1100 gantry systems to lift the hydrocracker off the barge onto a Self-Propelled Modular Trailer (SPMT). The SPMT then carried the hydrocracker to shore.

Products: Two sets of four SBL1100 Gantries

Year: 
2014