Transformer Installation with a Hydraulic Gantry

Transported to Texas by rail, the 330 ton transformer needed to be transferred from the drop deck railcar to a heavy haul truck in order to be delivered
Offloading the transformer from the drop deck trail car
Loading the transformer onto a heavy haul truck
Offloading the transformer at the San Angelo sub-station
A hydraulic gantry was utilized to install the transformer on its platform
A hydraulic gantry was utilized to install the transformer on its platform
The entire operation was controlled from the Intellilift wireless controller
The synchronized travel of the gantry enabled precision placement of the transformer
The synchronized travel of the gantry enabled precision placement of the transformer
Customer: 
Roll-Lift, Lower Colorado River Authority
Location: 
San Angelo, Texas

Challenge: Roll-Lift was tasked with transporting and installing a transformer at a sub-station in San Angelo, Texas. Transported to Texas by rail, the 330 ton transformer needed to be transferred from the drop deck railcar to a heavy haul truck in order to be delivered.

Solution: Roll-Lift utilized a hydraulic gantry to transfer the transformer from the rail car to the heavy haul truck. Upon arriving at the sub-station, the hydraulic gantry was utilized to install the transformer on its platform.

Products: SBL-900 Hydraulic Gantry

Year: 
2016