SHS-Series SyncHoist Synchronous Hoisting Systems
4 points SyncHoist System positioning a steel roof segment
Bridge segments are positioned using a 4-points Enerpac
SyncHoist System
SyncHoist System with four cylinders attached between the cables.
Download Catalog
pages in PDF format
Animation:
http://www.enerpac.com/Promo/Synchoist/Animation/Synchoist_animation.html
High precision load poitioning, vertically and horizontally – using one crane
Reduces the risk of damage from oscillations due to sudden crane starts/stops
Improves productivity and worker safety
Weather conditions play less critical role
Turn lifting into high accuracy hoisting and load positioning system
High accuracy (+/- 0.040 inch)
10,000 psi double-acting push/pull cylinders with parachute valves for added safety in case of hose rupture or coupler damage
May reduce costs when compared to conventional load positioning methods
Three options for system management & control:
Manual control
Extended manual control
PLC-control
© Enerpac 2006
www.enerpac.com