SHS-Series – SyncHoist Synchronous Hoisting Systems

4 points SyncHoist System positioning a steel roof segment Bridge segments are positioned using a 4-points Enerpac
SyncHoist System
SyncHoist System with four cylinders attached between the cables.

Download Catalog pages in PDF format


Animation:
http://www.enerpac.com/Promo/Synchoist/Animation/Synchoist_animation.html

  • High precision load poitioning, vertically and horizontally – using one crane
  • Reduces the risk of damage from oscillations due to sudden crane starts/stops
  • Improves productivity and worker safety
  • Weather conditions play less critical role
  • Turn lifting into high accuracy hoisting and load positioning system
  • High accuracy (+/- 0.040 inch)
  • 10,000 psi double-acting push/pull cylinders with parachute valves for added safety in case of hose rupture or coupler damage
  • May reduce costs when compared to conventional load positioning methods
Three options for system management & control:
  • Manual control
  • Extended manual control
  • PLC-control

© Enerpac 2006
www.enerpac.com