Enerpac Logo
Anmelden
Wagen

Offloading a 1,300 ton Hydrocracker

Customer

Beluga Projects Logistic, CJSC

Location

Russia

Challenge

Beluga was tasked with offloading a hydrocracker weighing 1,306 tons from a barge and bringing it onshore. Due to the weight and length of the hydrocracker utilizing a crane was not an option.

Solution

Beluga utilized two SBL1100 gantry systems to lift the hydrocracker off the barge onto a Self-Propelled Modular Trailer (SPMT). The SPMT then carried the hydrocracker to shore.

Products

SBL1100 Hydraulische Portalkrane