DOWNLOAD THE DECOMMISSIONING CASE STUDY PACK
Find out how portable machine tools solved four tough decommissioning challenges
- Learn how 200 steel and concrete piles were removed from a wharf structure.
- Find out how casings can be removed from an offshore oil platform.
- Read how a subsea wellhead was removed at a depth of 7000 ft (2,134m).
- Learn how a 1,680 ft (512 m) subsea pipeline was cut into sections and removed.