Applications
Enerpac has gained unique expertise in delivering hydraulic solutions for the controlled movement and positioning of structures.
Lifting an Underground Mining Truck to Fix a Flat Tyre
Changing a flat tyre on heavy machinery is one of underground mining’s most hazardous and time-consuming maintenance tasks, often taking up to 12 hours to complete in confined spaces with sloped surfaces.
Mining
Removing the Wheel Studs on a Caterpillar 777 Dump Truck
Loose wheel studs on Caterpillar 777 dump truck were increasing the vehicle's downtime and needed to be removed and replaced. The current method of removal used a cutting torch which was unsafe and would damage the main structure of the wheel.
Mining
The Enerpac Lightweight E-Pulse Electric Torque Wrench Pump Outperforms in the Harsh Environment
Global Engineering and Construction (GEC) was contracted to provide mechanical services on an oil and gas pipeline during a planned shutdown.
Oil and Gas
Lowering and Leveling a Caisson Pier Box for New Johnson Street Bridge
The existing 90-year-old Johnson Street Bridge is located at the heart of Victoria, B.C. and is in the process of being replaced with a new bridge that will serve the community for the next 100 years. The new bridge is being built adjacent to the existing bridge, allowing the important transportation connection into Victoria's downtown to remain open during construction. The new bridge design includes a 25 meter long by 20 meter wide bascule pier box which will house the mechanical and electrical componentry for opening and closing the bridge span across the marine harbor.
Bridges
Lifting and Rotating Suspended Loads with a Strand Jack Gantry with Rotation Unit
One of the many challenges for logistics companies in the power generation sector is installation of new equipment. Loads are typically transported on trailers positioned parallel to the power plant, however, the equipment needs to be lifted and installed perpendicular to the trailer.
Power Generation
SyncHoist Lifts and Positions Brisbane Riverwalk Concrete Girders
Building a 850m pedestrian riverwalk required pre-cast concrete girders weighing 385 tons to be lifted and positioned into place.
Bridges
Replacing Rail Bridge Decks with a Hydraulic Gantry
Timing is critical for rail construction projects to avoid unscheduled disruption to train and passenger services. However, the best project planning can be undermined by adverse weather conditions. High winds, greater than 12 mph, may prevent bridge deck lifting using a crane, leading to project delays.
Rail
Offshore Highway Construction - Lifting Challenges
The offshore highway is of a multi span bridge structure located in the open sea 100m to 200m from the shoreline. Each bridge pier consists of various concrete components, one of which will be a reinforced concrete, gravity base, which is placed on the seabed.
Infrastructure
Safely Releasing Furnace Bricks from a Steel Fixture
Vesuvius processes the bricks which are used to the line the interior of an industrial furnace. The bricks begin in a "soft" state and need to be compressed, hardened and heated before they are installed in a furnace. A steel box is filled and compressed hardening the bricks.
Manufacturing
Assembling and Transporting Electric Transformers with a Hydraulic Gantry
Tadeo Czerweny, a global leader in the electric power transformation market, based in Argentina, was seeking a solution after deciding to expand their manufacturing capacity and build higher-capacity electric transformers.
Power Generation