Enerpac has gained unique expertise in delivering hydraulic solutions for the controlled movement and positioning of structures.
Replacing Bridge Bearings without Interrupting Traffic to the Second Bosphorus Bridge
Located on the O-2 Highway in Istanbul, the Sadabad Viaduct is a connecting motorway to the Second Bosphorus Bridge; the 19th longest suspension bridge span in the world. Approximately 400 bearings needed to be replaced on the Sadabad Viaduct while the road remained continuously open to traffic.
Ponts
Jack Up System Lifts 1,500-ton Span on Fore River Bridge
No one would call the temporary bridge that was constructed in 2002 over the Fore River between Quincy and Weymouth, Mass., a work of art. The bridge replaced a 1936 Art Deco gem when it could no longer safely carry the 32,000 cars that cross the river each weekday.
Ponts
Safely Erecting a Bridge Over Water with a Hydraulic Driven Launching Nose
The KiwiRail project by Downer, completed this year, will permanently improve the country’s main trunk rail network and allow more freight to be carried over strongly refurbished structures to busy destinations including ports and intermodal facilities.
Ponts
Lifting the Songdo Cable-Stayed Bridge Pylons
Lifting and positioning two 2,000 ton cable-stayed bridge pylons into place. To prevent counter-balance issues, it was critical to erect both pylon sections simultaneously and within a very tight tolerance.
Ponts
Extending the Height of a Container Crane with a Jack-Up System
As ports grapple with the operational and logistical challenges of accommodating a new generation of super container vessels, their ability to upgrade existing crane facilities is critical.
Infrastructure
Transformer Installation with a Hydraulic Gantry
Roll-Lift was tasked with transporting and installing a transformer at a sub-station in San Angelo, Texas. Transported to Texas by rail, the 330 ton transformer needed to be transferred from the drop deck railcar to a heavy haul truck in order to be delivered.
Production d’électricité
Lifting a Historic Building for Renovation
Renovation of a historic building in Georgia's capital required the foundation to be repaired after it had sunk into the ground. The 100-year-old building needed to be lifted 3.4 meters onto pylons in order to be renovated.
Infrastructure
Tunnel Boring Machine Launched with EVO Synchronous Lifting System
The construction of the 4.5 km Waterview Connection motorway included the deployment of an Earth Pressure Balance Machine to bore a 2.5 km underground twin tunnel. Commencing the tunneling process required positioning the 3,600 ton tunnel boring machine into its starting position.
Infrastructure
Hydraulics play key role in the Installation of Venice MOSE Caissons
Over the last 100 years, the city of Venice has sunk 23 cm while sea levels have risen. In recent years the frequency and intensity of flooding has increased causing significant damage. The MOSE project is intended to protect the city from flooding.
Infrastructure